Report on the second information evening for Zuidrand

On 6 October 2026, the second information evening on the Zuidrand took place. Residents were given an explanation of the environmental study and were able to ask questions of specialists. Read here to find out what was discussed.

Explanatory notes: Plenary session

Introduction

On Tuesday 6 October 2026, the second public information evening was held regarding the Scope and Level of Detail Memorandum (hereinafter: NRD) for the Environmental Impact Assessment (hereinafter: EIA) of the Zuidrand area development in Apeldoorn. The Councillor for Zuidrand, Mr Wenzkowski, opened the evening. Programme manager Mr Tom Lankhorst then provided an explanation of developments in the area over recent years, the associated decision-making within the municipal council, and the further planning process for the coming year.

Explanatory notes on NRD

On behalf of the consultancy firm Witteveen+Bos, EIA specialist Mr Wouter Gaastra explained why an EIA is carried out, what exactly is examined in the EIA and what the procedure entails. He also described the four alternatives examined in the EIA. The slides from the presentation can be found in Appendix II to this report.

Plenary question and answer session

During the presentations and in the plenary question-and-answer session, participants were able to ask general questions about the Zuidrand, which were then answered by Mr Tom Lankhorst on behalf of Apeldoorn City Council and Mr Wouter Gaastra on behalf of the consultancy firm Witteveen+Bos. A brief summary of the questions asked is set out in Appendix I to this report.

Breakout sessions

Following the plenary session, participants had the opportunity to visit the various themed tables. At these tables, specialists from Apeldoorn City Council and the consultancy firm Witteveen+Bos were on hand to explain the various scenarios for the Zuidrand (development directions) and to answer any questions. At each themed table, there were maps of the planning area and the scenarios on which participants could leave their comments.

The key findings and comments made by participants are summarised below for each breakout session.

We would like to thank those present for their input and look back on a successful meeting. We will update you shortly on the next steps in the development of the Zuidrand.

Results of the Breakout Sessions

The key points raised at each thematic round table are set out below.

Theme Table 1: housing, amenities and energy

Participants wrote their comments, concerns and questions on Post-it notes and stuck them onto the cards showing the alternatives. As the Post-it notes are not clearly legible in the zoomed-out photos, they are transcribed below:

  • What makes it a village?
  • Space for facilities;
  • Why is access only available on one section of the A50?

In addition, the specialists at the thematic round-table discussions took notes on questions and concerns that came up repeatedly. These are summarised below. Questions were raised regarding:

Housing construction and housing types

  • What types of housing and price ranges are being developed in Host-City? In particular, is multi-storey housing part of the programme?;
  • How is it ensured that the homes are affordable for those looking for accommodation?
  • There is a need for housing in the villages: demand is particularly high in Beekbergen and Lieren;
  • How is it decided where and how many homes are to be built?
  • People are wondering why so many new homes are being built in the Zuidrand, whilst there is hardly any new-build development taking place in Beekbergen. An action committee has been set up to promote housing in Beekbergen for young people from the village, through the conversion or extension of existing properties;
  • Will the Beekdal remain free of housing?

Amenities and village identity

  • Several scenarios assume ‘no facilities’. This raises the question of how the development can then function as a village;
  • There is a need for communal spaces and facilities in the new development (the Zuidbroek extension is cited as an example of how, in residents’ view, a new development should not be designed);
  • There are concerns that shops and amenities in the new neighbourhood will lead to the depopulation of the existing villages;
  • At the same time, there is a need for retail facilities in the Zuidrand area, as residents of Beekbergen already have to travel to places such as Eerbeek, Loenen, Apeldoorn and Klarenbeek to do their shopping;
  • The pressure on healthcare facilities is already high in Beekbergen, and there are concerns that this pressure will increase if no new healthcare facilities are established in the Zuidrand area;
  • There are concerns that the development will no longer be designed as a village, but as a residential estate with amenities. According to residents, a village requires a different scale, structure and layout;
  • How is the existing pressure on facilities assessed and taken into account in the EIA?

Flexible housing and target groups

  • Which target groups will be living in the flexible housing?
  • There are concerns about a high turnover of residents and a lack of connection with the village;
  • There is a great deal of scepticism regarding Host City as to whether asylum seekers with recognised status might be accommodated there. How will the flexible housing affect the quality of life in Host City?

Energy and grid capacity

  • What will the energy supply look like in the area? Shouldn’t grid-conscious construction be given a more prominent place in the NRD?
  • Where will the substation be built?
  • Will there be any more solar farms in the Zuidrand?

Theme Table 2: Transport and Mobility

Participants wrote their comments, concerns and questions on Post-it notes and stuck them onto the cards showing the alternatives. As the Post-it notes are not clearly legible in the zoomed-out photos, they are transcribed below:

  • If no housing is to be built here, why is this area being designated as a main access route?
  • In the seepage area: will the homes stay here or will they be moved?
  • Construction of new bridges to facilitate traffic across the canal;
  • Preservation of the canoe routes;
  • Hanzegraaf: it’s already busy, and it’s only going to get busier;
  • Options 1 and 2 do not include any facilities; this is not in line with the village’s objectives;
  • Concerns about increased traffic in the villages;
  • Improving access to the A50 – a good idea.

In addition, the specialists at the thematic round-table discussions took notes on questions and concerns that came up repeatedly. These are summarised below. Questions were raised regarding:

Accessibility and connectivity

  • How will access to the area be provided, and how will traffic flow be managed?
  • How is the infrastructure integrated in relation to housing development and the natural environment?
  • Why don’t all the alternative routes connect to the A50?

Road safety and cycle routes

  • Road safety in the surrounding villages must be ensured;
  • Will the cycle route between Klarenbeek and Apeldoorn be improved?
  • There is a lack of understanding regarding the traffic management decisions and the various road layout projects in and around Beekbergen;
  • It has been observed that, at the recently modified speed bumps on Lierderstraat, traffic is either not slowing down sufficiently or, conversely, accelerating rapidly. Enquiries have been made as to whether other measures are possible to deter traffic and how these would take into account the quality of life in the villages;
  • It has been pointed out that road safety on the Elsbosweg is already under pressure at present and that this could deteriorate further as a result of the development;

Cutting through traffic

  • There are concerns about additional cut-through traffic from the new housing estate to the surrounding villages. Cut-through traffic is already an issue, including from the A50 through Beekbergen.

Theme Table 3: Landscape, nature and agriculture

Participants wrote their comments, concerns and questions on Post-it notes and stuck them onto the cards showing the alternatives. As the Post-it notes are not clearly legible in the zoomed-out photos, they are transcribed below:

  • A camera was installed without consultation for nature research, but in the wrong place;
  • Bats present + kingfisher;
  • Concerns about this area [Beekbergerwoud]. What impact does living in this area have?
  • The access road from the canal, heading towards the A1, runs entirely through ‘green’ areas. It seems more logical to me to locate the second access road to the A50 here as well (the one included in the fourth option).

In addition, the specialists at the thematic round-table discussions took notes on questions and concerns that came up repeatedly. These are summarised below. Questions were raised regarding:

Nature and nature compensation

  • How is nature compensation handled, and what does this mean for the agricultural landscape, including the area around the A50?
  • Is it possible that land from neighbouring plots and gardens may be required for nature compensation?
  • What does the approximately 100-hectare new nature reserve look like at the moment, and how is it being developed?
  • Does the nature reserve on the southern edge connect to the woodland being created on the other side?

Beekberger Forest

  • There are concerns that the effects of this development – such as drought and an increase in the number of leisure visitors and dogs – will lead to the deterioration of the Beekbergerwoud;

Stream zone

  • What role will the stream area play, and what spatial implications will this have for local residents?

Agriculture and land ownership

  • Will there still be room for agriculture in the area?
  • Will De Hooilanden be included in the plans, or are there other plans for this area?
  • Enquiries were made regarding the land holdings of Natuurmonumenten and their significance for the development;

Research

  • Enquiries have been made regarding investigations into instances where cameras were reportedly installed without consent, and what the results of those investigations are.

Theme Table 4: Water, Soil and Climate

Participants had the opportunity to write their comments, concerns and questions on Post-it notes and stick them onto the cards showing the alternatives. As the Post-it notes are not clearly legible in the zoomed-out photographs, they are transcribed below:

  • Properties in a seepage zone? How does that work?
  • The drying up of Beekbergsebroek. How do you deal with it?

In addition, the specialists at the thematic round-table discussions took notes on questions and concerns that came up repeatedly. These are summarised below. Questions were raised regarding:

Seepage and its impact on existing homes

  • Do properties need to be adapted, or will property values fall in areas affected by seepage?

Development of new homes

  • It has been stated that the area is wetland and that treating water and soil as a guiding principle may mean that fewer homes can be built than envisaged in the alternative proposal;

Landscaping of the stream near Lieren

  • How is the stream near Lieren being developed?

The drying up of the Beekbergerwoud

  • There are concerns that the effects of this development, including drought, will lead to a decline in the natural value of the Beekbergerwoud.

Questions and Answers

Below is a summary of the questions:

  1. Question: Why are the sub-regions still marked incorrectly on the map?
    Answer: That was a mistake: the planning area should not extend that far south, and not the entire planning area is to be developed for housing;
  2. Question: Who is the target audience for the flexible homes in Host-City?
    Answer: These properties are not aimed at a specific target group; they are let through housing associations in Apeldoorn;
  3. Question: The resident is unhappy with the way the local authority keeps residents informed (via various (digital) media) and by post;
    Answer: The local authority is doing its best to keep everyone as well informed as possible;
  4. Question: Why was a photo of Klarenbeek chosen for the presentation?
    Answer: That wasn’t done on purpose;
    Answer: We are also looking at the impact on the surrounding villages;
  5. Question: What is meant by the stream zone? How far does this zone extend?
    Answer: We want to preserve the stream valley. At this stage, we are still working with indicative areas;
  6. Question: Isn’t alternative 1 more of a neighbourhood than a village? Because the alternative does not include facilities such as schools and healthcare services;
    Answer: The baseline scenario sets out the associated impacts. Research will reveal the effects of a lack of facilities. In this way, we are exploring different angles of the playing field;
  7. Question: In option 2, housing development moves closer to the Beekbergerwoud, whilst this option focuses on water and soil management;
    Answer: Alternative 2 has a more spacious layout, leaving room for water and soil between the buildings. As a result, the housing development occupies a larger area in this alternative;
  8. Question: How do those 500 homes compare with the 30 homes that were the subject of such a hard-fought campaign, particularly by young people?
    Answer: The 30 homes are at a different stage and are not part of the planning process for the Zuidrand. The 500 homes have now been included in alternative proposals so that their environmental impacts can be assessed. The decision on whether these homes will actually be built will only be taken (much) later. This has no impact on the construction of the 30 homes;
  9. Question: The main access route is towards the A1; why not towards Apeldoorn?
    Answer: Particular attention is also being paid to connections with the city itself. The study focuses on both local and supra-regional connections;
  10. Question: Previous studies have been carried out into access options on the A1, involving complex bridge structures. What will this junction look like now?;
    Answer: That’s right, the connection is complicated. The alternatives are looking into how this can be incorporated;
  11. Question: If you have not submitted a statement of views at this stage, does that mean you are no longer allowed to submit one later in the process?
    Answer: That was the case under the old legislation, but now you are still allowed to submit comments. Nor is it the case that you cannot submit comments later if you did not do so right at the start;
  12. Question: Is the Environmental Impact Assessment Committee also being asked for advice?
    Answer: Yes, the members of the Committee have visited the project area. A consultation meeting is scheduled for the end of October;
  13. Question: What’s the point of submitting a statement of views now, when everything is still so abstract?
    Answer: Right now, there is still plenty of scope to make adjustments, so it certainly makes sense to submit a statement of views at this stage;
  14. Question: How can the local authority carry out housing development whilst taking grid congestion into account?
    Answer: Liander has given an assurance that the first 500 homes will definitely be connected;
    Answer: The local authority is also looking into other energy options, such as grid-conscious construction;
    Answer: Uncertainty regarding connection to the grid cannot be a reason to put housing development plans on hold;
  15. Question: Is the local council also looking into alternative energy systems, as they are in Arnhem?
    Answer: Yes, those are also being investigated by the local authority.
  16. Question: How will the Zuidrand be built, taking nitrogen into account?
    Answer: A great deal of electrical equipment is used;
    Answer: Much of the nitrogen emissions are offset by stopping the use of fertiliser on the pastures;
    Answer: The local authority must submit the nitrogen calculations to the provincial authorities, who will assess them and must approve them;
  17. Question: How is the Zuidrand funded?
    Answer: This needs to be investigated, and financial feasibility is also part of the assessment;
    Answer: The local authority aims to ensure that two-thirds of the housing on offer is affordable (social housing and mid-range rental/owner-occupied properties);
  18. Question: When will we get reliable maps? And couldn’t the name ‘Host-City’ be a bit more down-to-earth?
    Answer: The maps were the council’s mistake;
    Answer: The name ‘Host-City’ is a working title; a new name is being considered, but no decision has yet been made;
  19. Question: When can we expect a preferred option?
    Answer: At some point next year;
  20. Question: A resident finds it remarkable that there are so few facilities included in the alternatives;
    Answer: The effects of this are being investigated;
    Answer: The local authority is consulting with the village councils on this matter;
  21. Question: What is the timeline for the Zuidrand project? Informal discussions have already taken place; what will be done with the outcomes of those discussions?
    Answer: Those findings formed the basis for the 2025 Strategy Document;
    Answer: We will keep you informed of any further developments;
  22. Question: Is consideration also being given to the surrounding agricultural land?
    Answer: The surrounding agricultural land in the Hooipolder does not fall within the Zuidrand planning area. This matter can be discussed with Tom Lankhorst;
  23. Question: A resident living in Lieren says the road is just like a racecourse. What is the local council doing about it?
    Answer: The local authority is looking into traffic measures, but it does not have complete control over the situation;
    Answer: The local authority will start considering the necessary facilities as soon as possible.