In 2027, the construction firm NTP will begin work on the redevelopment of Kalverstraat on behalf of Apeldoorn City Council. The street will feature more greenery and more space for pedestrians and cyclists. The bus route will also be moved from Hofstraat/Kanaalstraat to Kalverstraat.

The municipality of Apeldoorn is working towards a greener, more attractive and more vibrant city. Based on the ‘Wildly Attractive Apeldoorn’ environmental vision, the ‘Apeldoorn City Park’ development plan and the Mobility Vision for the city centre, the city centre will be transformed into Apeldoorn City Park over the coming years.

The redevelopment of Kalverstraat is an important step in this process. The redevelopment will create more space for green areas, pedestrians and cyclists, and will make the street more attractive for residents, visitors and business owners. The project also ties in with the aim of keeping through traffic out of the city centre as much as possible. This ensures that the city centre remains accessible to local traffic.

Kalverstraat
The junction on Kalverstraat as it looks now.
Kalverstraat
Kalverstraat and the surrounding area from above, as it looks now.

Objections

As part of this ambition, the plan is to introduce a number of traffic restrictions in the city centre. Objections have been lodged against these traffic measures. An independent appeals committee is carefully assessing these objections. The appeals committee is an independent body that assesses objections raised by residents against municipal decisions and advises the municipal council on the matter. Following a hearing, the committee issues a recommendation, after which the council makes a final decision on the objection. Based on the outcome of this procedure, a decision will be made as to whether and how the traffic calming measures will be implemented. Where necessary, the design at the junction with Stationsstraat will be amended accordingly.

Start of works

Work on the redevelopment of Kalverstraat is continuing in the meantime. The traffic chutes are scheduled for the final stage of the redevelopment process. And even without the traffic chutes, this redevelopment will go ahead. That is why we are going ahead with the works as planned. Work is expected to begin in the first quarter of 2027 and will continue until the end of the year. During this period, sections of Kalverstraat will be temporarily closed and diversion routes will be in place.

A scene of a green street with a flower-filled central reservation and people walking along a wide footpath.
A glimpse of the wide footpath running alongside the green space.
A scene of a green street with flowers, trees, a cycle path and a wide footpath with pedestrians and a wheelchair.
A glimpse of what the street could look like with more greenery and space for cyclists and pedestrians.

Carrying out the work: what you can expect

The works will be carried out in phases to minimise disruption to the surrounding area as much as possible. During the works, local residents, business owners and visitors may experience temporary disruption due to, for example,.

  • Temporary closures of sections of Kalverstraat.
  • Adapted walking and cycling routes.
  • Temporary traffic measures and diversions.
  • Limited access to homes and businesses at certain times.
  • Noise nuisance caused by building works.

We will keep those affected informed in good time about the schedule, traffic arrangements and any diversions.

 

Key improvements

  • More greenery and cooler temperatures in the city
  • Safe cycle paths in both directions
  • Comfortable walking routes
  • An attractive link between the canal, the station and the city centre
  • A more attractive public space
  • A space for staying and socialising

Planning

  • February – July

    Redevelopment of Kalverstraat between the junctions with Hoofdstraat and Stationsstraat

  • September – December

    Redevelopment of Kalverstraat between Prins Willem Alexanderlaan and the Hoofdstraat junction

  • At the end of December

    Completion of works

A view of a wide street with flowerbeds in bloom, trees on both sides and a cyclist on the cycle path.
A glimpse of the street with its flowering borders and trees.
A bird’s-eye view of the street: a road with green verges, a cycle path and wide footpaths full of people.
A glimpse of the atmosphere: a street with plenty of greenery, a separate cycle path and wide pavements.

Funding and collaboration

This project is made possible in part by a European grant from the LIFE-IP Climate Adaptation Fund. Further information about this programme can be found on the Climate Adaptation Netherlands website.

More information

Would you like to stay up to date with the works? We share the latest information on the schedule, diversion routes and progress via the BouwApp. You can also contact us via the app.

Scan the QR code or search for the BouwApp in the App Store or Google Play Store, then select ‘Kalverstraat Apeldoorn’

QR code for the Kalverstraat construction app

Do you have any questions?

Please send an email to
kalverstraat@ntp.nl

Please get in touch via the BouwApp

or call Heleen de Walle (NTP Environmental Manager) on
06 59 83 44 93

More projects in the city centre