Driehuizerspreng

Driehuizerspreng

Until recently, the spring was largely underground and the water was mixed with overflow from the sewer system and discharged outside the stream system. The spring now flows into the Grift again, and the first restoration projects have been completed.

Three of the four western outlets have already been restored. The fourth joins the restored Orderbeek at Zanderijweg. The Driehuizerspreng has been constructed as an above-ground link to the Grift within a largely wide, park-like stream area. A feasibility study is being carried out into the confluence of the Orderbeek, the southern outlets of the Driehuizerspreng and the Grift.

Driehuizerspreng, Prins Willem Alexanderlaan

As part of the Driehuizerspreng PWA-laan project, the stream has been constructed above ground along PWA-laan, alongside a new green space and a footpath/cycle path. The Driehuizerspreng is connected to the Grift along PWA-laan. The water from the Driehuizerspreng now remains within the Grift system, which is a positive development. Clean water stays clean and offers good opportunities for nature conservation. The stream is passable for fish. Previously, the stream water was channelled underground towards Apeldoorn Zuid, where it could mix with overflow water from the sewer system. New trees, shrubs and wild flora have been planted in the stream area, and the cycle path has been relocated to make more room for the stream.

Although the Driehuizerspreng was constructed in 2016 between the Bronbeekhof and the Grift near the Waterloseweg, the water from the spring did not initially reach the Grift. The ground was not yet completely watertight. Often, the water itself seals small shrinkage cracks in the loam. That is what happened here too, just as it did with the Orderbeek.

Driehuizerspreng bij Sparta Luce mei 2012
Driehuizerspreng at Sparta Luce, May 2012.
De beekzone van de Driehuizerspreng langs de PWA laan vormt een ecologische en recreatieve verbinding met de Grift.
The stream area of the Driehuizerspreng along PWA Lane forms an ecological and recreational link with the Grift.
Wandelpad langs de Driehuizerspreng.
Walking trail along the Driehuizerspreng.

When

No separate vision has been drawn up for the Driehuizerspreng. The vision for the future of the stream forms part of the PWA Zone Area Vision. This has subsequently been set out in a development plan and image quality plan (PDF, 13.7 MB).

Although housing developments in the area are on a smaller scale than originally envisaged, work is underway on various projects to create a stream area as a key green infrastructure. An overview is provided below.

The project will be carried out in phases:

  • The Driehuizerspreng West blasting heads were carried out in 2012. As part of this, the blasting heads were refurbished and a path was laid.
  • The Driehuizerspreng Sparta Luce project was completed in 2011. Here, the drainage channel was re-routed above ground and a large wadi was created to allow rainwater to infiltrate.
  • Driehuizerspreng South – a design for this will be drawn up in 2024–2025. To make more room for water and nature, the stream area of the Driehuizerspreng will be expanded here. Following an information evening, the design will be further developed with a view to implementation.
  • Driehuizer culvert on PWA-laan, from Driehuizerweg to the Grift – 2016 works. Here, the culvert was constructed above ground with a junction to the Grift; the path was modified and the verge was renewed.

Other projects related to the blast:

  • As part of the housing development at Spartahof, rainwater was channelled via a separate system into the existing wadi, with an overflow to the spring, 2017–2020
  • As part of the Groenewoud development, a wadi with vegetation was created along PWA-laan. An overflow channel connecting this wadi to the Grift was installed in 2016.