Response document in response to comments on the draft design at the residents’ evening on 11 March 2025
Response document in response to comments on the draft design at the residents’ evening on 11 March 2025
We’re still looking into what would be a logical spot for the transition to the 30 km zone on Sprengenweg.
Yes, we’re not going to change that.
The carriageway will be surfaced with asphalt. Interlocking paving is not an option due to the risk of rutting. We have opted for red asphalt to highlight the 30 km zone.
No, in accordance with the road safety action plan, only the section between Badhuisweg and Koning Lodewijklaan will become a 30 km/h zone. The section from Koning Lodewijklaan to Henri Dunantlaan will remain at 50 km/h. However, separate cycle lanes will be introduced.
Yes, there is a speed bump at the Badhuisweg junction, which forces traffic to slow down.
We check all access routes for feasibility and adjust them where necessary.
There will be a slight rise between the driveway and the road.
If cyclists have to wait to turn onto Sprengenweg, the cycle path may be blocked for a short time. Based on experience at other locations with separate cycle paths and access points, we do not expect any major problems.
No, the car parks on Moeflonstraat are outside the Sprengenweg project area.
We have carried out a comprehensive parking survey on Sprengenweg and the surrounding streets. The total number of parking spaces along the entire length of Sprengenweg will be reduced by just three, which, in our view, will not cause any major problems.
Yes, we’ll do that by using the appropriate road markings to show where you can and cannot park.
Yes, the design will be technically developed in such a way that it is suitable for all types of traffic, including electric buses.
We’re going to look into whether it’s possible to fit this into the green space.
We will incorporate this into the final design.
Yes, this will be included in the final draft.
The final locations of all the small bridges can be seen in the final design.
The footpath will remain partially paved. We will look into the possibility of installing lighting. On the south side of Sprengenweg, there is a paved footpath with lighting that pedestrians can use.
All footpaths along Sprengenweg will be raised so that there is a clear distinction between them.
The crossing at Schuttersweg is being made safer through the construction of larger central islands. In addition, traffic speed is being reduced by a speed bump and a hairpin bend in the road, which helps to improve road safety.
This was considered, but was ruled out because it would have involved additional crossing manoeuvres.
Yes, the footpaths and cycle paths will be raised.
The roundabout will have a slight rise in the centre. This helps to prevent drivers from driving straight across it. Visibility of the new roundabout is good from all directions, meaning the risk of anyone driving straight across it is considered to be very low.
We’ll look into this.
We are not responsible for enforcement measures.
There is a comprehensive signage plan in place, with a sequence of signs; this cannot be amended for a single location alone. When the signage is evaluated as a whole, this comment will be taken into account. However, this will not happen in the short term.
No, there won’t be any zebra crossings; near the Apenheul, more people cross the road at one particular spot.
No, Sprengenweg will not be designated a “cycle street”.
Do you have any questions? Or would you like to know more?
Get in touch