Response document in response to comments on the draft design made at the residents’ evening on 15 July 2025.
Response document in response to comments on the draft design made at the residents’ evening on 15 July 2025.
We have deliberately opted for noise-reducing concrete paving stones. These stones help to reduce traffic noise and, at the same time, act as a speed-reducing measure.
Yes, speed bumps have been marked out at regular intervals. In addition, the junctions have also been raised; we call these junction plateaus. These plateaus also reduce speed and indicate where the speed bumps are to be placed. As there is also heavy goods traffic, a good balance has been sought between comfort and road safety.
Due to the large number of cyclists, we have decided not to include any narrowings in the design. This ensures it remains safe for cyclists.
That’s right; the design calls for a single, full-width pavement on one side of the street, so that the street is wide enough and safe throughout.
In the final design, we set out which species of trees will be planted. In doing so, we take into account light levels, sightlines and sufficient space for the trees to grow. The trees will be positioned so that they blend in with the streetscape.
No, the locations currently marked on the map are potential locations. The final location will depend on the position of cables and pipes. We will take this into account in the final design.
No narrowings have been included in the design.
We are still looking at the layout near the entrance to the Dekamarkt.
It was decided to provide a single, full-width pavement, which is situated opposite number 94.
Yes, the entrance will remain, and we will incorporate this into the final design.
The access points have been marked on the final design.
No, you need a permit for a new driveway. You can apply for this via www.apeldoorn.nl/vergunningen.
We have decided to have an external agency carry out an additional parking survey to ascertain the number of parking spaces.
Parking in the front garden where there is no driveway is not permitted.
Yes, by using different materials, we make it clear where parking is and isn’t permitted.
This falls outside the scope of our project plan for 1e Wormenseweg. Please contact us on 14 055 regarding this matter. Select option 6.
Yes, this is permitted. The parking bay complies with the requirements of the regulations on traffic rules and road signs.
We will incorporate the vortex distribution into the final design.
The sewerage system is being replaced. We are installing a separate sewer for rainwater. Electricity and gas are the responsibility of the utility companies and are not part of this project
We are improving the drainage system. This includes the installation of a stormwater drainage system.
There is no way to prevent lorries from travelling along 1e Wormenseweg.
We are looking at how we can ensure that goods vehicles can travel safely within the design.
There is no extra space to widen the driveway, as there are houses on both sides.
No, this falls outside the scope of our project plan and we will not be including it in the refurbishment.
We are introducing a number of speed-reducing measures, such as noise-reducing paving stones, speed bumps and raised junctions.
No, the number of cyclists is too low in relation to the number of cars and lorries.
No, this is outside the project area of the 1st Wormenseweg.
We will decide this together with the contractor. Local residents will be notified in good time.
The works will be carried out in several phases, so that businesses and local residents remain accessible as far as possible.
The work is expected to take about a year. The final schedule has not yet been announced.
We are drawing up a lighting plan, in accordance with the Apeldoorn standard.
We will include the lighting plan in the final design.
The junction has been made narrower in the design to make it clearer and safer.
Do you have any questions about this work? Or would you like to find out more?
Get in touch