Response document in response to comments on the preliminary draft made at the residents’ evening on 5 October 2026.
Response document in response to comments on the preliminary draft made at the residents’ evening on 5 October 2026.
No, we will retain the plateau as a speed-reducing measure. Prior to the start of the works, preliminary surveys will be carried out on all properties.
If we make the pavements here narrower, traffic will drive faster. This is not desirable.
No, the homes must be as accessible as possible.
No, adding a landing would mean the two landings would be too close together; a step would be added at house number 200.
Yes, this has already been taken into account and incorporated into the design.
We will take this into account in the green space plan, which will be included in the final design.
This falls under the Management and Maintenance department and will be taken into account.
We are discontinuing the ‘Groenvak’ scheme and introducing a threshold.
No, but we are introducing a speed bump as a speed-reducing measure.
We are closing the green zone so that the shop can continue to be restocked.
Yes, we’re going to lay a path.
We are removing the green area, which will create space for deliveries and for customers to park.
We adhere to the local authority standards, which you can find at Overheid.nl.
No, we follow the local authority standards in this regard; you can find these in the link above.
No, there’s no space for on-site parking, so we won’t be building a driveway.
No, this isn’t possible because there must be sufficient parking facilities.
We will be checking all the access roads; if an access road has been granted planning permission, we will incorporate this into the final design.
No, the locations for the lampposts still need to be finalised, and we will incorporate them into the final design.
We adhere to the local authority standards here.
The road will be slightly narrower than it is at present. Should this cause problems for heavy goods vehicles, a no-parking restriction may be introduced on the east side of the street.
No, there are several companies based there.
We’ll put the posts back or replace them with greenery.
Yes, we’ll include this in the project.
Cannot be adjusted due to space constraints.
The northern section will be almost the same width; the southern section will be the same as the northern section.
We will try to ensure that everyone remains accessible for as long as possible. Further details will be finalised in consultation with the contractor. Before work begins, the contractor will send out information regarding access to homes and, for example, car parking and the placement of skips.
The container storage areas will probably be on the east side of the road; we are still discussing this with Circulus.