Hagenweg, Waterjufferstraat and Libellestraat
The tarmac surface of the carriageway is being replaced with paving stones. Raised sections will be installed at the junctions of Hagenweg with Waterjufferstraat and Libellestraat. A raised section will be installed at the junction of Libellestraat with Waterjufferstraat. On Hagenweg, the verge and the pavement in front of numbers 1 to 27 (on the odd-numbered side) will be reversed. The pavement will now run along the property boundary, with the verge alongside the road. The carriageway on Waterjufferstraat will be narrowed, and the parking spaces will be situated in line with the green verges. Grass-paving slabs will be laid in the parking spaces to create a greener appearance. Waterjufferstraat will become a one-way street running from Libellestraat to Hagenweg. Where possible, green belts, possibly including trees, will be created. The pavement on the even-numbered side will be narrowed. Both the road and the green strip will be widened by approximately 50 cm. An infiltration drain will also be installed in Hagenweg, Waterjufferstraat and Libellestraat so that rainwater from the road can seep directly into the ground.
View the design drawings (PDF, 2.3 MB)
The design drawings are opened in a PDF file which is currently not digitally accessible. Are you unable to use this file? Please let us know, and we’ll be happy to help.