Derk Kamphuisweg

The carriageway will be considerably narrower than at present, which will benefit the trees and the gravel verges. Near the physiotherapist’s practice, the carriageway will be approximately 1.5 metres narrower than it is at present. The clinker-paved pavement and the parking spaces near the Dekamarkt will be retained. However, the clinker-paved carriageway will continue all the way to Ugchelseweg.

Speed-reducing junction platforms will be installed at the junctions with Klein Hattem and Methusalemlaan. The traffic-calming platform at the junction with Methusalemlaan has been extended around the green space there. The road link on the south side of the green space has been removed. Only a cycle and pedestrian path remains here.

On Derk Kamphuisweg, there is currently a pavement with paving slabs on both sides of the road within the gravel verge. We would like to reduce this to a maximum of one pavement on the south-hand side, as this provides that little bit of comfort that people are now used to. If all residents would prefer to see a full gravel verge on both sides, that is also an option. We would like to remove all the bollards near the physiotherapist’s practice and opposite it.

Where possible, we plant new trees. We only know for certain whether trees can actually be planted once we start digging. There may be cables or pipes in the ground that mean a tree won’t fit after all. Or we may be aware of their existence, but it turns out during digging that there isn’t enough space left. The aim is to plant the trees we have currently marked out. The green trees can probably be planted as planned. The yellow trees on the southern gravel verge are still somewhat less certain. This is linked to the renovation of the gas and water pipes. It is not yet clear where these pipes will be situated in the new layout. It is possible that, even in the new layout, they will be positioned in such a way that trees cannot be planted on the verge after all.

Cross-section of a street approximately 15 metres wide. On the left is a single large tree next to a gravel verge approximately 2.3 metres wide and a pavement approximately 1.8 metres wide. In the centre is a carriageway approximately 6.6 metres wide, including a single drainage channel. On the right are a gravel verge approximately 2.3 metres wide and a pavement approximately 1.8 metres wide. A car and two cyclists are shown to indicate scale. Dotted lines mark the total width of the profile.
Current situation on Derk Kamphuisweg. Illustration: Apeldoorn City Council
Cross-section of a street approximately 15 metres wide. In the centre is a 5-metre-wide carriageway, including a drainage channel, with a large tree on either side. To the left of the carriageway is a gravel verge approximately 5 metres wide. To the right are a gravel verge approximately 3.1 metres wide and a pavement approximately 1.8 metres wide. A car and two cyclists illustrate the available space. Dotted lines mark the total width of the profile.
New layout of Derk Kamphuisweg. Illustration: Apeldoorn City Council