On Tuesday 10 June, an information evening was held at the town hall. A number of questions were asked during this information evening. Below is a summary of these questions and our responses to them.
On Tuesday 10 June, an information evening was held at the town hall. A number of questions were asked during this information evening. Below is a summary of these questions and our responses to them.
Even at quiet times, drivers tend to drive fast on the Vlijtseweg. The southern section is already a 30 km/h zone. Following the roadworks, this speed limit will apply as far as Edisonlaan. Between Deventerstraat and Laan van Kerschoten, speed bumps must comply with guidelines for bus routes. Speed bumps beyond Laan van Kerschoten may be made steeper, depending on the bus route.
At crossings such as the Vlijtsemolen, the Pletterijpad and the Zwitsalpark, the best solution will be assessed on a location-by-location basis. Consideration will also be given to where zebra crossings are needed. The new layout will not eliminate the crowds, but it should reduce the speed of traffic. In phase 2, a decision will be made as to which users may be excluded.
Cut-through traffic often occurs during busy periods or when there are temporary road closures. A permanent solution is difficult to implement, as access must be maintained for services such as parcel delivery and refuse collection. Closing the Vlijtseweg to traffic or introducing one-way traffic on it will only be possible once a suitable alternative is in place.
Speed bumps will be installed where possible and appropriate. In the southern section, guidelines apply due to the bus route: these speed bumps are lower and longer. The distance between speed bumps must also comply with the guidelines. Unfortunately, there is no space for planters as on Laan van Kerschoten.
Mobile speed cameras are deployed by the Public Prosecution Service, based on road safety considerations and recorded incidents. The police decide where and when enforcement takes place. No information is currently available regarding the Vlijtseweg.
The current bus route is used by passengers travelling from the station to schools and, in future, to the new swimming pool as well. Relocating the route is therefore not a straightforward option. A different layout for Kanaal Noord is not possible at present, but will be considered in phase 2.
Greening is a priority for the municipality of Apeldoorn. Due to the volume of traffic, it is difficult to add more green spaces, particularly in the southern part and on the eastern side of the northern part. On the western side, plans are being considered to green the ecological zone along the Grift.
Under the new arrangements, all homes and businesses will remain virtually as accessible as they are now.
The redevelopment will have little impact on traffic patterns on Vlijtseweg. The increase in traffic caused by the swimming pool will largely occur outside peak hours. For phase 2, it must be clear how the surrounding area will be developed. Traffic data is already available, so a baseline measurement is not necessary.
Signage and road markings will comply with the statutory CROW guidelines. An excess of signage can actually cause confusion, so the council is taking a cautious approach in this regard.
The current right-of-way arrangements will remain in place. Traffic engineers consider any change to be unsafe.
Work is now focusing on Vlijtseweg. Phase 2 will look at reducing rat-running and car traffic. This will require a viable alternative to the current traffic flow.
A study is being carried out to determine whether blind-spot mirrors along Vlijtseweg contribute to road safety. The suitability and effectiveness of their use are being assessed on a location-by-location basis.
Low-noise asphalt has been investigated, but at a speed of 30 km/h the effect is negligible. For this reason, it will not be used on the Vlijtseweg.
Residents have suggested making Vlijtseweg a one-way street. This is not currently possible due to heavy traffic on the surrounding roads. In phase 2, this will be considered as an option within the broader transport strategy.
Do you have any questions? Or would you like to find out more?
kanaalzone@apeldoorn.nl
Would you like to stay up to date with all the latest developments in the Canal Zone?
Sign up for the Kanaalzone newsletter