Below you will find questions or comments from residents, followed by the council’s response.
Below you will find questions or comments from residents, followed by the council’s response.
We deliberately chose concrete paving stones. These stones help to slow traffic down.
The concrete paving stones are coated with a layer that prevents them from becoming slippery.
Yes, speed bumps are marked at regular intervals.
Rubber speed bumps cause a lot of inconvenience, wear out more quickly and cause more damage to cars.
That’s right; the design provides for a single, full-width pavement on one side of the street, ensuring that the street is wide enough and safe throughout.
No, a plateau will affect the traffic and right-of-way situation.
This is a point to bear in mind during the works, and we will therefore raise it with the relevant contractor.
No, we’re going to narrow Hagenweg so that the speed limit is reduced.
No, there isn’t any room to widen it.
We will review the bend profile once again and make adjustments where necessary to ensure that the bend is sufficiently navigable.
In the final design, we set out which species of trees will be planted. In doing so, we take into account light levels, sightlines and sufficient space for the trees to grow. The trees will be positioned so that they blend in with the streetscape.
No, the locations currently marked on the map are potential locations. The final location will depend on the position of cables and pipes. We will take this into account in the final design.
We have been tasked with increasing the amount of greenery, and maintaining it is also a priority in this regard.
No, you need a permit for a new driveway. You can apply for this via www.apeldoorn.nl/vergunningen.
According to the car park survey that was carried out, there are sufficient parking spaces.
Parking in the front garden where there is no driveway is not permitted.
We want to create a sense of uniformity, and grass-reinforced concrete adds a touch of greenery between the paving slabs.
The sewerage system is being replaced. We are installing a separate sewer for rainwater. Electricity and gas are the responsibility of the utility companies and are not part of this project.
We are improving drainage, partly by installing a stormwater drainage system.
We will pass this on to Vitens.
We are going to implement a number of speed-reducing measures, such as cobblestones and speed bumps.
No, we’ve looked into this, but it’s not possible for the collection services (Circulus).
We will decide this together with the contractor. Local residents will be notified in good time.
The works will be carried out in several phases, so that businesses and local residents remain accessible as far as possible.
The works are expected to take around one year. The final schedule has not yet been finalised. All residents will be informed as soon as further details are available. The works will be carried out in phases.
We are drawing up a lighting plan using the standard lighting columns used in Apeldoorn.
We will include the lighting plan in the final design.
Public roads are not designated as specific training grounds for the CBR.
No, the end of the road is clearly visible (up to 100 metres).
We will take this into account during the implementation, and the local council is aware of this.
No, the layout of Tullekensmolenweg must be, and must remain, unambiguous. For safety reasons, reflective posts have been chosen.
This falls outside the scope of our project. We will inform the relevant neighbourhood manager about this.